Operational Results First month of the New Lima Airport

STATISTICS IS OPERATION FIRST MONTH OPERATION OPERATIONS AEROLINE FLATS DESTINATIONS NEW JORGE CHAVEZ AIRPORT OF LIMA CALLAO

✈️ Exclusive Benefits for Readers

Verified codes to save on your next trip.

5%
OFF

Travel insurance

International insurance to travel around the world.

NARENAS
5%
OFF

Discount on chips

International e-sim for travel around the world.

NARENAS
5%
OFF

Car rental

Rent your car with a discount everywhere.

NARENAS

LAP presentó los resultados operativos del primer mes de operaciones de la nueva terminal del Jorge Chavez airport: more of 2 Millions of mobilized passengers. LAP Photo

In its first month of operations, the new Jorge Chavez International Airport movilizó a más de 2 million passengers (2,134,91) y operó más de 14 A thousand flights (14,873), between takeoffs and landings. What's more, near to 80% On the scheduled flights left punctual, fulfilling their established itineraries. The airport maintained an average daily flow of 70 thousand passengers, going from 279,000 Passengers in the first week to a total higher than 2 millions at the end of the first month.

1 New Lima Airport Month

Today, All systems are working, así como el equipamiento necesario que permite atender la actual demanda de pasajeros. The Nuevo Jorge Chávez work with 27 Salas with sleeves and 13 salas operadas a través de buses internos; and contemplate a second phase, planned for January 2026, en la que se incorporarán 19 mangas adicionales para alcanzar una capacidad de atención hasta 40 million passengers per year.

On the operational level, solutions are applied in check-in processing times, Self -delivery of suitcases (self bag drop), use of e-gates and migrations. Permanently, We have been attending the requests of the Ositran and reviewing the identified findings, Working very closely with migrations, airlines, Airport specialized operators, among other actors involved in airport operation.

Cuando se inició la operación en el nuevo aeropuerto, The average safety control time was 28 seconds. Currently, has been reduced to 20 segundos y se continúan implementando mejoras. Este proceso es posible gracias al uso de tomógrafos de última generación, que permiten realizar inspecciones de seguridad sin necesidad de retirar dispositivos electrónicos o líquidos del equipaje de mano.

Respecto a la recepción de equipaje en llegadas, Delivery times have been refining. in addition, desde el inicio de operaciones se vienen implementado mejoras en la señalética tanto en los espacios públicos del terminal (parking lots, vía libre, boulevard, check-in, áreas comunes), as in restricted areas (National and international boarding rooms, corredores de conexión, etc.), facilitando la orientación y desplazamiento de los usuarios.

Gracias a un convenio interinstitucional suscrito por la Policía Nacional del Peru (PNP), The airport has reinforced its police contingent, that operate the 24 horas del día con una dotación permanente, cuenta además con una moderna comisaría exclusiva para las labores aeroportuarias y módulos de atención de la PNP en todos los pisos del terminal, guaranteeing a safe environment for all passengers and visitors.

Leave a comment on this post!