PROJECT EXTENSION INVESTMENT INVESTMENT INAGUuration Employment Work International Airport El Dorado Maxx Edmax Maximo Bogota Colombia Flights Aerolineas Cargo

This would be El Dorado Max de Bogotá airport

The advances of what to be presentedíA Laureloón of the Bogot International Airportá, known as the golden edmax development.

The El Dorado Airport is the M airportáIt's important to Colombia, the máimportant s of AméLatin rich by transported annual passengers, overcoming even City of México and São Paulo, the máS Important Load of Latinamérich and occupies the locationón 20 In the world as Hub MáIt's important. It is currently in expansión y modernizationón to become the El Dorado M airportáXimo Development.

Today I show you and tell you what to beíto El Project in case it comes to realize and I sayía, since all we will see are estimates and render 3D of the general idea, so it isá subject to changes and adjustmentsún the observations and final needs of the development of the airport infrastructure Más important of the regionón.

The new golden airport Max

The El Dorado Max project is a private initiative that seeks to improve the experience of passengers and airlineídenies, así how to increase airport capacity to address the growing TRáI'm theéguilty of MAIN SUBS OF LATINAMérica. The project in general includes the constructionóN of new filming streets, expansionón of the North track, the expansionón of the current national and international terminal, The improvement of loading facilities and new auxiliary buildings.

Before moving on, I leave a video on the YouTube channel with Tomas and IMá3D genes to know Más Details of this impressive and ambitious growth plan:

Currently by Bogotá pass 45.8 million passengers per year, of which 30.2 millions are doméstatic and 16.8 international million, with 30 aerolíPassenger neas that cover 56 international destinations and 45 nationals. Regarding load, from Bogotaá It is transported 806.459 annual load tons with 21 aerolídenies.

With this growing TRáFico and demand, Dorado problems are known and the need for improvement and expansion is feltón of what is alsoén one of the airports máSon of the región. Así The  Edmax Project.

CharacteríStatics of the El Dorado M airportáximo

Although toún the project isá in design stageñO, evaluationóN and needs development, It is known that the main general objectives are the following:

  • Inversionón of 9.7 Billions of Colombian Pesos de Inversión 100% private.
  • Execution timeón 78 months.
  • Hornbeamán 104 interventions throughout the project.
  • New terminal: The new terminal will beá más big and modern that the current. Countá con más stores, restaurants and services for passengers.
  • It is planned to increase in a 118% The ability of the airport passenger terminal, reaching a átotal area of 489.320 m², including expansión of the national dock in 29.530 m² and of the international dock in 121.710 m², Among other works.
  • Increaseá from 39 boarding bridges 75.
  • New platform aircraft movement systems.
  • New máQUINAS IN SECURITY FILTERS AND ESCáNeres.
  • With the works it is expected to have the ability to receive 73 million passengers per year.
  • Expansionón and 800 meters from the north track.
  • 7 New Rolling Streets RáI ask.
  • Improvement of loading facilities: Load facilities will be expandedán and modernizeán to attend the growing volume of load toérea.
  • It will improveán the víAirport land access.
  • And many others.

Benefits of El Dorado Max Airport

The benefits are MáS Clear, But it is worth listing them in Tégeneral terms:

  • Better experience for passengers and airlineídenies: The new terminal and improved facilities offerán a better experience of passengers and airlineídenies.
  • Increased airport capacity: The expansionón of the airport allowá attend the growing TRáI'm theéreo.
  • A generationóemployment no.: The generate projectá más de 7.300 of direct and indirect jobs and it is estimated that the airport community reaches 44.000 workers.
  • IMPULSE TO THE ECONOMía: El Dorado Max Airport contributeá TO DEVELOPMENT ECONóBogot mycoá and from Colombia.

Expected, subject to everything goes well and the new concessi contract is madeón, THE START OF CONSTRUCCIón of the mega projection is for December 2028 and the end of constructionón isé Ready in May of 2035.

Leave a comment on this post!

Scroll to start